
Extension Foundations. Without the Mess.
Building a timber-framed extension or granny annexe? Ground screws bypass the disruption of deep-trench concrete — engineered to spec, installed in a day, ready to build on immediately.
Why Builders Choose Ground Screws for Extensions
Six reasons architects and builders trust us with their extension foundations.
Engineered to spec
Each foundation specified to your extension's loads, build method, and ground conditions.
Minimal garden disruption
No trenches, no spoil heaps, no concrete trucks. Your garden survives intact.
Fast-track your build
No 3-7 day concrete cure. The frame can be erected the same day.
Cost-effective
Often more cost-effective than equivalent concrete strip foundations, especially on awkward sites.
Works on any site
Sloping plots, restricted access, listed-building neighbours — we deliver where concrete trucks can't reach.
Annexes & granny pods
From 20m² studio annexes to full self-contained dwellings.
From Survey to Solid
Engineering Survey
We work with your builder, architect, or structural engineer to spec the right screw size, depth, and quantity for your specific extension.
Engineered Quote
Fixed-price quote within 24 hours, with installation date, screw spec, and load capacity for your extension's footprint.
One-Day Install
Our team installs each screw to the agreed grid layout, typically 1-2 days for a standard single-storey extension.
Hand-Over
Every cap left perfectly level. Your frame can be erected directly onto the screws the same day. No cure time, no waiting.
Extension Foundations:
Ground Screws vs Concrete Strip.
Concrete Strip
- Deep trenches required
- Skip and spoil removal
- Garden access destroyed by spoil and trucks
- 3-7 day cure before frame can go up
- More expensive on sloping sites
MW Ground Screws
- No excavation needed
- No spoil to dispose of
- Garden access preserved
- Frame can be erected same day
- Better-value on tricky sites

How We Build An Extension Foundation.
An extension foundation is engineered to the structure above it, so the screw count and spacing are set from your plans rather than a fixed formula. Ground screws come into their own on sloping plots, made-up ground or sites with restricted access, where a traditional trench-and-concrete footing is slow and disruptive. In many cases the foundation can be installed in a day with no excavation and no spoil to cart away, letting the frame go up soon after — all backed by our 35-year structural guarantee.
Read our reviewsExtension Foundations Across Our Six Counties.
Extension Foundations: Frequently Asked Questions
Are ground screws suitable for extensions?
What size extension can ground screws support?
Do extensions on ground screws need planning permission?
How does this compare to traditional concrete strip foundations?
Can I build a granny annexe entirely on ground screws?
What about extensions next to listed buildings or in conservation areas?
Does my builder need any special equipment to work with ground screw foundations?
What's the longest extension you've foundationed on screws?
35 years guaranteed.
~60 years engineered.
Every screw under your extension is backed by a 35-year structural guarantee. Hot-dip galvanised steel construction, designed to outlast the extension it supports.
- Hot-dip galvanised steel
- Engineered to load spec
- Documented at installation
Every ground screw we install is backed by a 35-year structural guarantee. Depending on ground conditions, the hot-dip galvanised steel construction has an expected lifespan in the region of 60 years — significantly longer than the concrete it replaces.
*Expected lifespan depending on ground conditions.
Ready to start your extension?
Free site survey within 48 hours. Fixed-price quote within 24 hours. 35-year guarantee on every install.
